[Notice] [Namje Hall] Emergency Repair Work Due to Stormwater Drainage Pipe Blockage
- 2026-05-22
- 40
Emergency Repair Work Due to Stormwater Drainage Pipe Blockage
Due to a blockage in the stormwater drainage pipe around Namje Hall, emergency repair work will be carried out as follows.
- Construction Area: Southern side of Namje Hall
- Schedule: May 23, 2026 (Sat) from 09:00 AM until restoration is completed
- Reason for Construction: Inability to drain stormwater in the west courtyard due to blockage in the stormwater drainage pipe
- Construction Details: Replacement work for the underground stormwater drainage pipe
- Note: Some noise may occur due to the use of an excavator.

