Dormitory Heating/Cooling Supply Standards and FCU User Manual
1. FCU (Heating/Cooling System) Usage Guide
1) Central Supply System
- Heating and cooling are centrally controlled by the Dormitory Management Office.
- If the central system is not actively supplying heating or cooling, your in-room FCU will not produce any temperature change, even if it is turned on.
2) Seasonal Transition Period (Cooling ↔ Heating)
- Switching between cooling and heating modes requires a system changeover, which takes approximately two weeks.
- This usually occurs in May and November, during which all heating/cooling functions will be temporarily suspended.
3) When Heating or Cooling Starts
- The Dormitory Management Office monitors indoor and outdoor temperatures and begins central supply when the temperature meets the designated criteria.
- For more details about operating temperatures, please refer to the dormitory website (Home > Info > Heating & Cooling).
4) FCU Cleaning
- Each FCU unit is disassembled and thoroughly cleaned once a year by the dormitory staff.
5) How to Operate the FCU in Your Room
- You can adjust the power, fan speed, and temperature by opening the cover on the right side of the FCU.
- Temperature control is only available when central supply is active.
2. Dormitory Cooling Supply Standards(Based on Outdoor Temperature / For Reference: Indoor Temperature)
Outdoor Temperature |
Max 27°C | 30°C | 33°C | Above 33°C | - |
---|---|---|---|---|---|
Min 24°C | 27°C | 30°C | |||
Supply Schedule | 10:00 ~ 18:00 | 07:00 ~ 24:00 | 07:00 ~ 02:00 (next day) | 06:00 ~ 02:00 (next day) | |
Duration | 8 hours | 12 hours | 14 hours | 15 hours |
※ Additional cooling supply may be provided depending on the perceived temperature.
※ Proposed Summer Cooling Supply Schedule: May 15 – September 30 (subject to adjustment based on temperature).
※ To prevent moisture-related issues, the cooling controller in each room must remain switched ON at all times during the cooling supply period.
3. Dormitory Heating Supply Standards(Based on Outdoor Temperature / For Reference: Indoor Temperature)
Outdoor Temperature | Max 15°C | 10°C | 5°C | 0°C | Below -5°C |
---|---|---|---|---|---|
Min 10°C | 5°C | 0°C | -5°C | -8°C or lower | |
Supply Schedule | 21:00 ~ 24:00 04:00 ~ 07:00 | 20:00 ~ 01:00 04:00 ~ 07:00 | 11:30 ~ 13:00 18:00 ~ 23:00 01:00 ~ 07:00 | 07:00 ~ 13:30 17:00 ~ 23:00 01:00 ~ 07:00 | 07:00 ~ 07:00 (next day) |
Duration | 6 hours | 8 hours | 11 hours | 18 hours 30 minutes | 24 hours |
※ Additional heating supply may be provided depending on the perceived temperature.
※ Proposed Winter Heating Supply Schedule: October 15 – April 30 (subject to adjustment based on temperature).
4. FCU Maintenance (Cleaning)
- Period: During the summer vacation every year.
- Target Buildings: Namje Hall, Yongji Hall, Hwahong Hall, Gwanggyo Hall, International Dormitory, Ilsin Hall.
- Scope and Procedures:
- Floor-standing FCU Units (Namje Hall, Yongji Hall, Hwahong Hall, Gwanggyo Hall): Cleaning and disassembly washing.
- Ceiling-mounted FCU Units (International Dormitory, Ilsin Hall): Filter cleaning (complete cleaning and disassembly washing every 4–5 years).
5. Guide to Using the Dormitory Heating/Cooling Controller